Pressure Safety & Relief Valve Maintenance
SCOP OF SERVICE
– Remove and Re-install
– 100% Maintenance
– Popping Test
– Seat Test
PRESSURE SAFETY VALVE
Hot Flow Test (On-line Testing)
For Boiller Valve
ON-SITE MAINTENANCE
Pressure Safety and Relief Valve Maintenance
STANDARD REFERENCE
– Api 526,flanged Stell Safety Relief Valve
– Api 527 Seat Tightness Of Pressure Relief Valve
– Asme Section Viii, Pressure Vessel Division 1
Testing
Popping test and seat tightness
Safety Valve Boiler Section 1
Test fluid is nitrogen on pressure up to 3,000 psig
SCOPE OF WORK FOR SAFETY VALVE
ชนิด | ขนาด | แรงดัน | On Shop | On Site |
Gate | 1″ – 36″ | 125 – 2500 lbs | 1″ – 36″ | 1″ – 36″ |
Globe | ½” – 36″ | 125 – 2500 lbs | ½” – 36″ | ½” – 36″ |
Plug | 1″ – 12″ | 125 – 900 lbs | 1″ – 12″ | 1″ – 12″ |
Ball | 1″ – 12″ | 125 – 900 lbs | 1″ – 36″ | 1″ – 36″ |
Safety Relief | 1″ – 12″ | 125 – 2500 lbs | 1″ – 12″ | 1″ – 12″ |
Butterfly | 1″ – 36″ | 125 – 600 lbs | 1″ – 36″ | 1″ – 36″ |
Check | 1″ – 36″ | 125 – 2500 lbs | 1″ – 36″ | 1″ – 36″ |
Diverter | 1″ – 12″ | 125 – 300 lbs | 1″ – 12″ | 1″ – 12″ |
Diaphragm | 1″ – 24″ | 125 – 300 lbs | 1″ – 24″ | 1″ – 24″ |
Reactor | 1″ – 12″ | 125 – 600 lbs | 1″ – 12″ | 1″ – 12″ |
Actuator | All types of action | |||
- Inspect outside and clean body , bonnet, inlet and outlet nozzle by instrument air.
- Record Tag NO, Mfr, data in check sheet.
- Remove spindle nut.
- Marking adjust bolt lock nut ,bonnet , valve body and record in check sheet.
- Remove the adjusting bolt lock nut.
- 6.Remove stud bolt between bonnet and valve body.
- Disassembly bonnet and valve body.
- Marking guide ring and nozzle ring.
- Cleaned spindle spring washer , nozzle , disc ,disc holder insert and guide.
- After cleaning and component , then inspect nozzle and disc. If damage they were need to
- repair or lapping.
- Assembly all parts and accessory.
- Test popping , setting and leak test.
Lift up safety valve vertical on the test bench.
- Applied air pressure, Nitrogen or water ( hydro test high pressure ) in to test system.
- Increase pressure until setting pressure or safety valve popping if setting pressure correct specification do not adjust bolt spring, but the setting pressure not correct their need to adjust bolt spring until setting pressure correctly specification.
- After popping test finish do to tightening adjusting bolt lock nut.
- Seat leak test or seat tightness test at 90% of set pressure conform API 527 standard as
following attachment sheet. - Record data and wire seal
- After inspect nozzle and disc then it was found scratch point should be lapping .
- If disc and nozzle have more damage , it needs to re-machine.
- If disc and nozzle can not lapping or re-machine it need to change with spare part.
- After lapping finish should be clean with water , Acetone , cleaning Thinner and drying by
- Instrument air.
- Assembly all parts.
- Test popping and leak test as follow up to procedure.